| ## Alternative schedules | |
| By utilizing the building block, we can search for different types of schedules depending on the need. We illustrate few of them here below: | |
| * 1F1B-V schedule without doing any B-W split. | |
| * Schedule with 2/3rd 1F1B memory by utilising B-W split. Note that two microbatches are included in a single building block to avoid collision. | |
| * Variation of interleaved 1F1B with lower memory |